CLIENT:
Lafarge Tarmac LTD
Design and build haul road into new quarry from existing highway approximately ¾ mile away.
The services we offered on this project included;
• Road design works.
• Setting out.
• Kerbing.
• Section 278 works to form bellmouth to side of existing A-road.
• Temporary diversion of existing stream.
• Installation of box culverts.
• Sub-soil drainage.
• Ground improvement works.
• Surfacing works.
• Fencing and signage.
• Mammal rails.